常見問題
question
企業(yè)案例
case
聯(lián)系我們
- 聯(lián)系人:濟南燕翔鐵藝制品有限公司
- 手機:15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
鋼結構安裝前要對加工構件驗收檢查
來源:http://qzone9781.cn 日期:2022-10-20 發(fā)布人: 瀏覽次數(shù):14次
鋼結構安裝前對于廠區(qū)進場的鋼構件不進行驗收檢查就安裝,是不對的,雖然構件在出廠前雖檢查合格,但在運輸、堆放、裝卸、吊放過程中有可能造成構件變形、焊縫撕裂、涂層脫落等現(xiàn)象,如不檢查進行矯正、修補,構件就可能不符合驗收標準要求,尤其是焊縫被撕裂,安裝后會導致嚴重事故。為了減少損失,由此可見,安裝前做好對構件的驗收檢查是非常重要的。
Before the installation of steel structures, it is wrong to install the steel members entering the factory without acceptance inspection. Although the members are inspected as qualified before leaving the factory, they may cause deformation, weld tearing, coating peeling and other phenomena in the process of transportation, stacking, loading and unloading, and lifting. If they are not inspected and corrected, the members may not meet the requirements of the acceptance standards, especially the weld tearing, which will lead to serious accidents after installation. In order to reduce losses, it can be seen that it is very important to do a good job of acceptance inspection of components before installation.
所以濟南輕型鋼結構安裝前對構件重新檢查是很有必要的程序,如發(fā)現(xiàn)有運輸、堆放、裝卸、吊放中造成的變形、焊縫撕裂、涂層脫落、碰撞損傷等情況,要及時矯正、修補。安裝前核對圖紙也是保證工程順利進行的重要因素。
Therefore, it is necessary to recheck the components before the installation of Jinan light steel structure. If any deformation, weld tear, coating peeling, collision damage, etc. caused by transportation, stacking, loading and unloading, and lifting are found, they should be corrected and repaired in time. Checking drawings before installation is also an important factor to ensure the smooth progress of the project.
核對檢查圖紙也是安裝鋼結構前重要的事項。鋼結構制作安裝前對鋼結構設計圖紙不仔細審查圖紙。在鋼結構制作安裝中常出現(xiàn):圖紙不齊全,圖面不明確,制作無依據(jù),尺寸錯誤多,材料采購困難,施工順序不當,精度達不到,配合不協(xié)調等問題,從而造成停工、返工返修,甚至報廢,影響工期,加大成本,造成浪費,達不到設計要求。
Checking and checking drawings is also an important matter before installing steel structures. The design drawings of steel structures are not carefully reviewed before the fabrication and installation of steel structures. In the fabrication and installation of steel structures, problems such as incomplete drawings, unclear drawings, no basis for fabrication, many size errors, difficulty in material procurement, improper construction sequence, failure to reach the accuracy, and uncoordinated coordination often occur, which cause stoppage, rework, repair, or even scrapping, affect the construction period, increase costs, cause waste, and fail to meet the design requirements.
安裝鋼結構前需要做好安裝的技術交底、構件的驗收檢查、核對檢查圖紙等相關的事項,以保證工程的順利進行,防止出現(xiàn)因對接不明確或者構件受損等影響工程的質量。
Before installing the steel structure, it is necessary to do a good job in the technical disclosure of the installation, the acceptance inspection of the components, the check and inspection of the drawings and other related matters to ensure the smooth progress of the project and prevent the quality of the project from being affected due to unclear docking or component damage.
以上就是關于鋼結構安裝前要對加工構件驗收檢查的講解,希望對您能有所幫助。更多相關內容就來我們網(wǎng)站http://qzone9781.cn進行咨詢了解吧!
The above is the explanation on the acceptance inspection of processed components before the installation of steel structures. I hope it will be helpful to you. More relevant content will come to our website http://qzone9781.cn Consult and understand!
下一篇:如何去除鐵護欄上的鐵銹和焊渣 上一篇:帶你了解鐵藝護欄的注意事項